construction and maintenance
Building for the future
Help us to repair and maintain the Lighthouse of Hope Camp. At this moment we are considering three projects that will be of benefit to the churches that use our facilities and to the various ministries functioning at the camp.
3 construction projects
Chapel Construction
Include the phrase "chapel project" with your donations
Project cost: $90,000 American dollars
We are praying for a chapel, currently it works in a shared space with the dining room, in this way we feel that we must improve the infrastructure of the camp spaces; We also think together that this project will help us to have a suitable center or place to include more attendees within the meeting time, creating a welcoming and comfortable environment for these important activities such as: conferences, talks, meetings, counseling, preaching, praise and worship, among others.
OBJECTIVES:
- Improve the camp infrastructure
- Provide more space for campers and leaders to meet and learn about God
- Create a space for the storage and protection of sound and program equipment
PLANS
- The construction of two bathrooms
- One counselling office
- Program areas
- Sound booth
- Wheelchair ramps
- Seating
- Baptismal tank
- Air conditioning
Help us fund this project
$10.000 USD OUT OF $90.000 USD RAISED
Maintenance Project
Include the phrase "project renovation" with your donations
Goal: $20,000 American dollars
The Faro de Esperanza Camp opened its doors in 2007. Since then we have served various local ministries and other churches. During this time the camp property has required repair and maintenance to its installations. This includes regular repair and care for the aluminum window frames and ceiling fans. A few months ago we were able to buy new mattresses as the old ones were no longer in good condition. We also must regularly varnish the wood to protect it from the harsh ocean breezes.
There are ongoing expenses and the maintenance requires time.
During the pandemic, maintenance became difficult due to lack of rents. Now you can help us to complete the renewal of a new camp for our brothers who attend the ministries.
OBJECTIVES
- General renovation of the entire camp.
- Prevent deterioration of the wood
- Improve the common and living areas for guests of the camp
PLANS
- Repair or replace wooden pillars that are deteriorating
- Change the windows in the cabins
- Repair or replace the doors damaged by termites and the sea air
- Change the door knobs and locks in the cabins
- Replace the toilets in the cabins
- Reinforce the bases of the building pillars that are deteriorating
- Restore the bars on the windows
- Repair of the floor of the cabins
Help us fund this project
$3.893,38 USD OUT OF $20.000 USD RAISED
Weber House Renewal
Include the phrase "Weber house" with your donations
$15,000 USD Amercian dollars
This was the first building constructed at camp and was used to house the workers and many people who came to help us in this ministry. Since those early days it has been used as a home for the families living at camp who help take care of it. Repairs are necessary, especially in the wooden pillars that have been eaten away by the humidity of the sea air.
In addition the public washrooms on the first floor of the Weber House need repair.
Once these jobs are done, the house will be as good as new.
OBJECTIVES
- Prevent the advancing deterioration of the home and especially the pillars that are decaying.
- Make certain improvements to the space the family taking care of the camp lives in. Repair the balcony
PLANS
- Wooden pillar bases affected by humidity
- Repair the balcony
- Repair the public bathrooms
- Change the windows in the house due to deterioration of the aluminum
- Repair broken doors
Help us fund this project
$11.680,15 USD OUT OF $15.000 USD RAISED


$1,500 USD Amercian dollars
This was the first building constructed at camp and was used to house the workers and many people who came to help us in this ministry. Since those early days it has been used as a home for the families living at camp who help take care of it. Repairs are necessary, especially in the wooden pillars that have been eaten away by the humidity of the sea air.
In addition the public washrooms on the first floor of the Weber House need repair.
Once these jobs are done, the house will be as good as new.
OBJECTIVES
- Prevent the advancing deterioration of the home and especially the pillars that are decaying.
- use for the multipurpose space
Help us fund this project
$0.00 USD OUT OF $1.500 USD RAISED
This is just the beginning
We will continue with the Renovation of the interior of the Faro de Esperanza Camp, if you want to help or know more about the projects, contact us at WhatsApp